SONO Participates in BCN2013

Image

SONO was commissioned to install a number of LED screens for the FINA World Championships, held at the Palau San Jordi (Barcelona) from 19 July-4 August 2013.



The installation (which can be seen in the background of the time-lapse video, after 20 seconds from the start) comprised three LED screens: a 30sqm, 6mm Barco Black, at the top; an 8sqm Barco Black, below it; and a 25sqm, 10mm Kinesic, installed at ground level so as to a serve as a walkway for swimmers making their way towards the pool.


Time-lapse video of the construction of one of the swimming pools for BCN2013


Published
18/08/2013